Image
Details
Title
Pardee Dam, -- Construction View, -- Showing main chute at right, which carries concrete mixture from plant on hill to base of tower. Mixture is then raised to hoppers, shown in tower, then down through chutes hung on counter-weights and finally through pipes called "elephant's trunks," moved where concrete is to be placed.
Full Collection Name
Selections from The Bancroft Library
Other Identifiers
BANC PIC 1996.020 v.1:21
Type
Image
Archive
The Bancroft Library
Usage Statement
Researchers may make free and open use of the UC Berkeley Library’s digitized public domain materials. However, some materials in our online collections may be protected by U.S. copyright law (Title 17, U.S.C.). Use or reproduction of materials protected by copyright beyond that allowed by fair use (Title 17, U.S.C. § 107) requires permission from the copyright owners. The use or reproduction of some materials may also be restricted by terms of University of California gift or purchase agreements, privacy and publicity rights, or trademark law. Responsibility for determining rights status and permissibility of any use or reproduction rests exclusively with the researcher. To learn more or make inquiries, please see our permissions policies (https://www.lib.berkeley.edu/about/permissions-policies).
Linked Resources
Collection